Gemini 105M vs Pdq 34
Compare up to 4 boats side by side.
On the numbers
Next to the Gemini 105M, the Pdq 34 is 0.4 m longer and of similar displacement. The Gemini 105M has the higher D/L (112), the Pdq 34 the lower (103). The Gemini 105M has the higher Comfort ratio (11.4, lightweight racing), the Pdq 34 the lower (7.8, lightweight racing). The Pdq 34 has the higher Capsize screening (3.65, above the guideline), the Gemini 105M the lower (2.80, above the guideline).
Gemini 105M
|
Pdq 34 | |
|---|---|---|
| General | ||
| Builder | Performance Cruising Inc. | PDQ Yachts Inc. |
| Designer | Tony Smith | Ted Clements |
| Hull type | Catamaran Twin Cbrd. | Catamaran Twin Cbrd. |
| Rigging | Masthead Sloop | Fractional Sloop |
| Construction | FG | FG |
| First built | 1995 | 1988 |
| Last built | 2000 | 1991 |
| Number built | 110 | – |
| Dimensions | ||
| Length overall | 10.21 m ▼ | 10.57 m ▲ |
| Waterline length | 9.68 m ▼ | 9.93 m ▲ |
| Beam | 4.27 m ▼ | 5.56 m ▲ |
| Draft (max) | 1.52 m ▲ | 0.84 m ▼ |
| Draft (min) | 0.46 m | – |
| Weight & ballast | ||
| Displacement | 3,629 kg | 3,629 kg |
| Engine & tanks | ||
| Fuel | 136 L | – |
| Water | 227 L | – |
| Ratios | ||
| D/L | 112 ▲ | 103 ▼ |
| Comfort ratio | 11.4 ▲ lightweight racing | 7.8 ▼ lightweight racing |
| Capsize screening | 2.80 ▼ above the guideline | 3.65 ▲ above the guideline |
| Hull speed | 7.55 kn ▼ | 7.65 kn ▲ |
| KSP | 0.71 | – |
▲ highest and ▼ lowest value in each row. Ratio bands as on the yacht pages; – means the value is not in the catalogue.